Tracking the LRT
Tracking the LRT, link to article If you don’t have the time to read the article, here are my five takeaways: A consultant was hired to conduct a 3-million dollar planning, design and engineering study for a 16-kilometre, east-west track throught the downtown and write a preliminary design report. The preliminary design report will show…